Crystal Reports: Pre-Training Configuration Check

There is special setup required for Crystal Reports training, notably installing Crystal Reports and connecting it to a HIFIS database. This setup must be completed prior to training and will require IT support. If this is not completed in advance the training cannot proceed as scheduled!

Find a time before your scheduled training to meet with Ali to verify that your environment is connected correctly.

Ali Ryder
10 minutes
Times shown in